OVER 1 MILLION HP OF INSTALLED COMPRESSION

PROFICIENT AND PROFESSIONAL

Obsidian facility designs are critically reviewed in many operating conditions as part of the project scoping phase. Project timelines are typically driven by the sourcing of major equipment. With increased focus on project economics and rate of return, the used-equipment market has become a more prominent resource. Our engineering and procurement staff have a proven track record of sour suitable equipment at favorable costs and lead times to meet the project demands. 

PROJECT HIGHLIGHTS

PROJECT: KARR SOUTH OIL BATTERY 
TIC: $40MM 

A greenfield battery that included natural gas compression (50 MMscfd), oil storage/distribution (8,000 bbl/d) and water injection (21,000 bbl/d). The major pieces of equipment that were installed: 3800HP of engine-driven reciprocating compression, 3-phase inlet separator, power generation, gas dehydration package, oil treater, LACT, 30,000 bbl of fluid storage, water injection (centrifugal and reciprocating pumps), VRU and flare system. 


PROJECT: MARTEN HILLS OIL BATTERY 
TIC: $20MM 

This 16,000 bbl/d green-field oil battery project included inlet separation, sales compression, dehydration, heat exchangers, oil treating, tank treating, tank storage, skim/recycle system, oil/condensate blending, water injection, vapour recovery, HP flare, power generation and a truck-load/offload system. Obsidian completed this project on a low-cost basis by sourcing and procuring refurbished equipment.


PROJECT: EDSON GAS PLANT  
TIC: $60MM

An expansion project that included a de-ethanizer, stabilizer, lean oil absorber, 3000HP refrigeration compression (20 MMscfd) and a steam heating system. 


PROJECT: SIMONETTE REFRIGERATION EXPANSION 
TIC: $55MM

Brownfield plant expansion primarily included a new refrigeration package and a utility heat package, liquid gas processing (treater/dehydrator), and pump capabilities (2,500 bbl/d). The scope also included facility optimization and piping modifications to allow for oil treating, storage, and a LACT addition for further handling downstream.


PROJECT: ROCK CREEK FACILITY EXPANSION 
TIC: $6MM 

An expansion of an existing facility to add sales gas compression each project included 100 MMscfd compression, separation, propane refrigeration, condensate stabilization, NGL storage and utility systems.

   OTHER OBSIDIAN TEAM EXPERIENCE

PROJECT: Gas Transmission Expansion
TIC: $90 MM

Brownfield compressor station expansion involving the installation of two solar turbine-driven centrifugal compressor sets with a rated capacity of 292 MMscfd each.

PROJECT: M2 & D1 Gas Plants
TIC: $65 MM each

Each project included 100 MMscfd compression, separation, propane refrigeration, condensate stabilization, NGL storage and utility systems.

PROJECT: Edson Gas Plant
TIC: $60MM

Expansion project that included a de-ethanizer, stabilizer, lean oil absorber, 3000HP refrigeration compression and a steam heating system.

PROJECT:
Simonette Refrigeration Expansion
TIC: $55MM

Brownfield plant expansion that primarily included a new refrigeration package and a utility heat package.

PROJECT:
Columbia Compressor Station
TIC: $35 MM

A greenfield compressor station and refrigeration plant. Scope included recovery of ethane and butane as well as a sales compressor and condensate pumps.